Poughkeepsie, NY. Over time the stream eroded the bank away and ended up taking the sewer main and manhole with it. We replaced the manhole and 80ft of 18” main. Then re-located and rehabilitated about 120ft of stream bed. Took 4 of us 8 days from the first scoop to the last.