Black Rock Consortium in the village of Cornwall. 70ft of 12” water main sitting on stone piers spaced 12’ apart over a stream/waterfall in Cornwall. Pipe is over 100 years old and needs to be replaced. We dismantled the old broken 12” water main, rebuilt footings, set steel beams, installed 80 ft of new 12” ductile iron pipe, (2) new 12” valves, (1) 6” valve, insulated the pipe, and wrapped it all in stainless steel for protection.